XiNBEi Lighting Brass Wall Sconces Set of 2 Modern Gold Sconce Light Fixture with Fabric Shade Wall Lamp for Bathroom Bedroom Corridor & Living Room XB-W1307-WBS

★★★★★ 4.2 59 reviews

$88.99
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by www.connectingtable.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
$88.99
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Apr 29
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by www.connectingtable.com
Free 30-day returns Details

Product details

Management number 209743213 Release Date 2026/03/29 List Price $35.60 Model Number 209743213
Category
  • MODERN DESIGN: Hardwired brass wall sconce balances clean industrial lines with traditional charm to create a beautifully balanced lighting source. The elegant brushed brass lamp body arm can support a range of transitional and modern white fabric shade that emits soft light, creating a warm atmosphere for your room. Wall sconce light fixture can be used in various indoor occasions to decorate your home.
  • FEATURE: Indoor Wall lights features a square brushed brass finished back plate, a flared shape white fabric shade,a straight long arm and a decor knob at the bottom. The flared white fabric shade gives you a comfy feeling with its soft light and perfect for lighting general areas. This fabric wall lamps is set of 2 just and mounted vertical only.
  • E12 BASE SOCKET: This gold sconces wall lighting suggest to takes one maximum 40 watt E12 base bulbs (incandescent, CFL or LED compatible). Bulbs not included.
  • EASY INSTALLATION: Hardwired. Mid centery modern sconces wall decor set of 2 come with mounting hardware accessories and instruction for quick and easy installation.
  • ETL LISTED. For any question on any replacement accessory, just feel free to contact us.
Color Brass
Shape Flared
Voltage 120 Volts
Wattage 40 watts
Bulb Base E12
Room Type Bedroom, Entry, Living Room, Bathroom, Hallway, Kitchen, Corridor
Brand Name XiNBEi Lighting
Model Name Wall Sconce
Style Name Modern
Shade Color White
Finish Types Brushed
Fixture Type Non Removable
Light Source Incandescent / CFL / LED
Manufacturer XiNBEi Lighting
Model Number XB-W1307-WBS
Power Source Hardwired
Material Type Iron, Linen
Mounting Type Wall Mount
Warranty Type Limited
Shade Material Fabric Shade
Lighting Method Uplight
Number of Items 2
Installation Type Semi Flush Mount
Required Assembly Yes
Specification Met ETL
Light Fixture Form Sconce
Included Components Mounting Hardware
Indoor Outdoor Usage Indoor
Water Resistance Level Not Water Resistant
Number of Light Sources 1
Item Dimensions L x W x H 5"L x 6"W x 20"H
Specific Uses For Product Home
Manufacturer Warranty Description 1 year warranty.
Other Special Features of the Product Wall sconces set of 2

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.2 out of 5
★★★★★
59 ratings | 24 reviews
How item rating is calculated
View all reviews
5 stars
78% (46)
4 stars
6% (4)
3 stars
3% (2)
2 stars
2% (1)
1 star
11% (6)
Sort by

There are currently no written reviews for this product.